Novus 777 Tower

Owner: Novus Innovation Corridor As subcontractor on this project we completed a large tenant improvement project that included installing 50 Water Source Heat Pumps, three CRAC units and duct detectors. In addition to the equipment being installed, our solution included installing condenser water piping, ductwork and condensate drains associated with this improvement project. In addition, … Continued

Banner – Cooling Towers

Owner: Banner Health As the prime contractor for this Banner Campus project, we oversaw the removal of four existing cooling towers and replaced them with four new stainless steel cooling towers. Along with the removal and install work, we leveraged the skills of several subcontractors who performed and completed all the associated electrical and structural work, … Continued

North High School – HVAC Upgrades

Owner: Phoenix Union High School District Within eight buildings on the campus of North High School, we replaced and installed Energy Management systems and the accompanying mechanical equipment to achieve optimal learning conditions for the students and faculty. From the Liberal Arts building to the Central Plant to the Stadium-Lockers-ROTC facility to the Old Gym, … Continued

2600 N Central – Controls Upgrade

Owner: Metro Commercial Properties Within this sizeable multi-story building in Central Phoenix, our Controls team has provided many solutions to many tenants in the building to keep them comfortable and in control of their energy systems. Our services range from providing a Service Contract for the building’s Controls system to ensuring longevity and risk mitigation … Continued

Phoenix Children’s Hospital – AHU Replacement

Owner: Phoenix Children’s Hospital Serving as the prime contractor for Phoenix Children’s Hospital, we took the lead on replacing the facility’s RTU-6618 and associated chilled water and hot water piping system. Throughout the project, significant ductwork was required within patient care spaces, challenging us to move some zones from one AHU to another while maintaining … Continued

Steward Observatory

Owner: University of Arizona The University of Arizona needed an HVAC upgrade for its Steward Observatory facility that consists of three buildings, with the largest of the three standing at five stories. This assignment was a design-build fast track project that required three GMP’s to be completed within twelve months and involved replacing 210 large … Continued

Paradise Valley Elementary School #33

Owner: Paradise Valley Unified School District Within four new buildings of Paradise Valley Elementary School #33, including two two-story classroom buildings, an administration building, and a multi-purpose building, our scope was inclusive of the installation of an HVAC system and the accompanying controls throughout classrooms, multi-purpose areas, offices, bathrooms and corridors. Our goal for this … Continued

Hello Fresh

Owner: Hello Fresh Hello Fresh needed major assistance with tenant improvements within its food processing plant that was made up of a warehouse and office section within the building. As an existing building, it presented some challenges regarding the thousands of square feet of excavation, back fill and trench compaction required before plumbing could be … Continued

Landing 3

Working alongside Landing 3, we managed several projects that consisted of everything from providing initial plumbing plans to executing the installation of all underground plumbing, domestic water lines, and roof drainage within a 525,000 square feet multi-building Class A industrial space. In addition to the shell build out, our team took part in ten spec … Continued

Honeywell Site Repurpose

Owner: Honeywell Upon receiving a request for our involvement in a fast-paced, government-based emergency funded industrial project, we responded within hours and provided a proposal and solution within days. With limited design input at the time, we committed to ensuring an operational facility in under 30 days. The scope of the project turned out to … Continued