Owner: Phoenix Children’s Hospital
Serving as the prime contractor for Phoenix Children’s Hospital, we took the lead on replacing the facility’s RTU-6618 and associated chilled water and hot water piping system. Throughout the project, significant ductwork was required within patient care spaces, challenging us to move some zones from one AHU to another while maintaining the positive and negative pressure required to meet COVID-19 protocol. We developed the ICRA plan and worked with the impacted hospital department to maintain workspace negative pressurization along with HEPPA filtration regulations. For this project, we managed numerous subcontractors who completed the electrical, rigging, test & balance, building automation needed. In concert with this project, we performed three other COVID-19 protocol related projects in different areas of the hospital – at the same time.